- 1、Canvas Canvas Prints mountain and water Landscape operable wall Artworks Hotel Decoration Wall Paintings operable partition
- 2、Office Meeting Room Movable Wall Project:Guanghou Baiyun Xueshan Cultural And Creative Valley
- 3、Banquet Hall partition wall project of Dali International Hotel successfully completed!
- 4、Congratulation For Completion Of Atlanta Sheraton Hotel Project
- 5、Congratulation for the completion of Hainan International Convention Center
- 6、Warmly Congratulation for the completion of Sheraton Hotel Movable Wall Project in Kunming
Sliding Partition product category
Product category
Contact us
Egood Operable Partition
- Tel:+86-757-85632132
- Mob:+86 18676591075
- Email:sales@egoodpartition.com
- Addr:No. 2, 2 heng Road, Shirong Industry Zone, Hecun, Lishui Town, Naihai District , Foshan , Guangdong China (Mainland)
- More
Warm congratulations for Twins water entertainment removable wall partition installation completed
Twin Waters is the first premium ultra-modern entertainment centre which covered 22,600-square-foot, currently still under construction in the Lekki area of Lagos, Nigeria. Spanning five floors with awesome views of the Atlantic Ocean, it features 12 luxury stores, two fine-dining restaurants, four modern event suites, a rooftop bar and the very first ultimate gaming arcade in Nigeria,Rufus and Bee. Egood provides removable wall total solution in their restaurant at the 4th Floor. In 18th July, 2017, our project manager and Enginner went Negeria to complete track installation. Now,in 20th April, 2018, our engineer come here again for panel installation.
The local labor are installing the panel. Track was installed several months ago and ceiling has completed. So we open demountable track, slide the panel make carrier inside the track.
Local labor are locking panels accordingly.
Egood engineer with Negeria installer
We also supply acoustical fabric pads for wall decoration in meeting room. It is hexagon shape with different colors. We also shipped the tools for easier install.
The building manager are having removable wall operation training.
Egood engineer with Twins water entertainment architect.
The removable wall partitioning will put to use very soon. Warm congraculations for Twins water entertainment project successfully completed !