• Over 100 countries,180 star hotel's common choices
  • My space,my way!
 

Twin water entertainment removable wall partition

Updated:2018-12-25 17:20:05
 

Twin Waters is the first premium ultra-modern entertainment centre which covered 22,600-square-foot, currently still under construction in the Lekki area of Lagos, Nigeria.  Spanning five floors with awesome views of the Atlantic Ocean, it features 12 luxury stores, two fine-dining restaurants, four modern event suites, a rooftop bar and the very first ultimate gaming arcade in Nigeria,Rufus and Bee.  Egood provides removable wall total solution in their restaurant at the 4th Floor.  In 18th July, 2017, our project manager and Enginner went Negeria to complete track installation.  Now,in 20th April, 2018, our engineer come here again for panel installation. 

 

The local labor are installing the panel.  Track was installed several months ago and ceiling has completed. So we open demountable track, slide the panel make carrier inside the track. 

Local labor are locking panels accordingly. 

Egood engineer with Negeria installer 

We also supply acoustical fabric pads for wall decoration in meeting room. It is  hexagon shape with different colors. We also shipped the tools for easier install. 

The building manager are having removable wall operation training. 

Egood engineer with Twins water entertainment architect. 

 

The removable wall partitioning will put to use very soon.  Warm congraculations for Twins water entertainment project successfully completed ! 

 
粤ICP备10049640号