- 1、2020-2021 Part Of The Clients List Overseas
- 2、Egood full view glass wall, give you perfect office environment
- 3、About Egood Company
- 4、The Easiest Installation Type-EG 108 Double Layer Office Glass Wall
- 5、Shipment of the new project in Hongkong is completed
- 6、People’s Bank Of China Movable Partition Project
Company news new article




Product category
Contact us
Egood Operable Partition
- Tel:+86-757-85632132
- Mob:+86 18676591075
- Email:sales@egoodpartition.com
- Addr:No. 2, 2 heng Road, Shirong Industry Zone, Hecun, Lishui Town, Naihai District , Foshan , Guangdong China (Mainland)
- More
SGS Heavy Duty Track System Load Testing At Egood's Workshop
on 29Sep,2020, SGS company organized a site testing facibility at Egood's Second workshop for the heavy duty steel track and aluminum track durability testing.
as per BS 4875-7:2006 standard.
Perfect UK replica watches with fashion styles and high quality are on hot sale!
All the UK AAA fake watches are available online.
Test requirement:
Horizontal slide (loading) and durability test of sliding partition door track
Assemble the track and two sets of casters on the test frame provided by applicant. Load
the track and rollers with load of 1860 kg, and connect the test frame to a cycling machine
which can lead the frame move back and forth. A cycle consists of push the frame to 600
mm forward and pull back to the original position (total 1,200 mm). The number of test
cycle is 20,000 and the frequency is 6±2 times per minute.
After the test, the track and wheels shall keep its function.
Load testing :1860kg
Test result: Pass